Document the room
Confirm what remains, what comes out and how the new shower fits the existing footprint.
Bathroom transformation
One genuine bathroom sequence—from the original tub platform through demolition and open-wall work to the completed tiled shower.
Before · during · after
The original jetted tub and deep tiled platform filled the window end of the bathroom. The renovation removed that assembly, opened the surrounding wall and floor where access was required, and rebuilt the area as a tiled shower with a sliding glass enclosure.
The glass-block window, walnut vanity and gray floor give the sequence clear visual anchors. They make it possible to follow the same room through every stage without borrowing photographs from another job.
The conversion sequence
Four views follow the room from the existing jetted tub to the finished shower.




Work in motion
These videos are compressed, never autoplay and wait to download until you choose to play them.
How the work connects
Demolition, access, water management and final fitting have to be planned as one sequence.
Confirm what remains, what comes out and how the new shower fits the existing footprint.
Remove the tub platform and expose the wall and floor only where the new work requires access.
Prepare the shower assembly, waterproofing, tile and plumbing connections in the correct order.
Fit the glass enclosure and reconnect trim, fixtures and surrounding finishes cleanly.
Related services
Flooring, drywall and fixture work can be reviewed as part of the same renovation.
Considering a tub-to-shower conversion?
Wide photos, the existing fixtures and what you want to change are enough to start the conversation.