Based in Westmount · Serving London & St. Thomas 519-808-3312hekmanhomeservices@gmail.com
Completed Westmount living-space phase with plank flooring, pot lights and a deep-blue feature wall

Ongoing Westmount transformation · London, Ontario

A home transformation built in thoughtful phases

This is an ongoing project, planned and completed in stages around the clients’ life, timing and budget. Every finished phase is designed to connect with what came before—and what is still ahead.

Project in progress

Phased Westmount home transformation

A long-term plan, built at the right pace for the homeowners

This project has been intentionally completed in thoughtful phases rather than treated as one rushed renovation. Layout changes, demolition, drywall, painting, flooring, lighting and storage work established the direction of the home before the kitchen and later finishing phases moved forward.

The confirmed bathroom scope is one powder-room renovation. The project also includes kitchen work, cabinetry, doors, trim and related finishing. Some phases are complete; the overall transformation and kitchen are not.

  • Layout changes and demolition
  • Drywall, surface preparation and painting
  • Plank flooring and pot lights
  • Kitchen cabinetry and ongoing kitchen work
  • One powder-room renovation
  • Storage, doors, trim and finishing

Work completed in connected phases

From demolition to a kitchen still in progress

Five selected photographs continue the sequence below; the completed living-space phase is shown in the project hero above. The kitchen remains a current progress view, not a final after photograph.

Westmount main-floor demolition and layout changes in progress
Phase: demolition and layout changes
Westmount room protected with coverings while painting is underway
Phase: protection and painting
New pot lights installed across the Westmount main-floor ceiling
Phase: new pot lights
Hekman Home Services crew installing kitchen cabinetry in the phased Westmount project
Phase: cabinetry installation
Current Westmount kitchen progress before the planned backsplash and final styling
Current kitchen progress — not the final after

What is still planned

The kitchen is not being presented as finished

Cabinetry and major surfaces are in place, but the backsplash and final styling remain ahead. The planned backsplash is white 2-inch by 10-inch subway tile installed in a herringbone pattern and carried to the ceiling.

There is no finished-kitchen rendering on this page. When the real final work is complete, the project story can be updated with an accurate after photograph.

Explore kitchen renovations

Why the phased approach works

Each stage protects the bigger plan

Completing a home in phases can make the budget and disruption more manageable, as long as every decision supports the later work.

Start with function

Address layout, lighting, storage and the surfaces that influence the whole main floor.

Protect finished work

Prepare and cover completed areas while the next phase is underway.

Connect each choice

Coordinate flooring, paint, cabinetry, doors and trim with what is already complete.

Stay accurate about progress

Show completed phases clearly while staying honest about what still remains.

Planning a renovation in phases?

Start with the whole plan, even if you build it one stage at a time

Show us the rooms, priorities and timing. We will help identify how the pieces should connect.

Request a quote519-808-3312